Solar & BESS Installation for CleanPeak Energy

Project Overview

Client: CleanPeak Energy
Project Size: 5MW Solar Farm + Battery Energy Storage System (BESS)
Location: New South Wales

Duration: 4 months

TOBCO was engaged by CleanPeak Energy to deliver a 5MW Solar Farm and Battery Energy Storage System (BESS), a significant addition to Australia’s growing renewable energy network. The project reflects TOBCO’s ability to deliver turnkey renewable solutions, integrating civil, mechanical, and electrical expertise under one roof.

The works were completed over a 4-month delivery program, with TOBCO self-performing across all disciplines to ensure high-quality outcomes, efficient timelines, and seamless integration of renewable technologies.

Scope of Works

TOBCO managed the full scope of works, which included:

  • Civil works including piling, trenching, and site preparation
  • Mechanical installation of steel structures and racking systems
  • Installation and connection of PV modules
  • Electrical fit-out, including AC and DC cabling, terminations, and testing
  • Integration and commissioning of BESS units and central inverters

Key Features

  • Nextracker NX Horizon single-axis tracker system for optimal solar energy capture
  • LONGi bifacial modules for high efficiency and durability
  • Sungrow central inverters and containerised BESS units for advanced energy storage
  • Fully self-performed delivery of civil, mechanical, and electrical works

Project Outcome

The project was delivered on time and on target, demonstrating TOBCO’s strength in managing complex renewable infrastructure projects. By combining technical expertise with strong in-house resources, TOBCO provided CleanPeak Energy with a future-ready solar and storage solution that supports Australia’s transition to clean energy.

For project enquiries, please reach out to our estimating team at 02 8000 1224 or estimating@tobco.com.au

CONTACT US

Feel free to call us (02) 8000 1224 during our business hours or complete the below form.